Pump Station 1
Pipeline first station, Distant is 0000 KM, elevation is 396.5 M, it has four main line pumps: two pumps 580 m3 capacity for each another two 1000 m3 capacity for each.
PETCO Heglig Control Centre (PHCC) is a custody metering station facility that is located in Heglig field, approx. 1 – 1.5 km from 2B Operating Company (2B OPCO) processing area. WHCC is owned and operated by PETROLINES for Crude Oil Company to enables export of crude oil from Block 5A in South Sudan. via a 24-inch pipeline of 172 km .and received at WHCC for metering purpose, after that for exploring at Pump Station No. 1 for transportation to Port Sudan Marine Terminal MT through the existing 28-inch pipeline.
Marine Terminal is the terminal station, Distant is 1506 KM, elevation is 16 M, it has eight storage tank, 400 K/ tank, four Booster & four Shipping Pumps, Five Generators (mobilized to upstream on june, 2012 Currently Power Supply through NEC) and exporting via SPM (Single Point Mooring).