Petrolines for Crude Oil
PETCO took over operatorship of the Transportation System from Greater Nile Petroleum Operating Company (GNPOC) on first of September 2014 as the first national operator of a crude oil
pipeline and its associated facilities in Sudan. the 28 inch pipeline spans
a length of 1504 KM from Heglig in South Kordofan to the Marine Terminal (MT1) in Port Sudan.
PETCO’s remotely controls the transportation system by a SCADA system from a centralized Main Control Centre (MCC) utilizing
an integrated high speed digital telecommunication network to connect MCC and the various sites via voice and data.
